Fastrack Power | Santa Ana CA | 2023

This 40,000 SF, two level grow warehouse may be the most difficult project KDG has completed to date. the project started at one level, but after a $12,000,000 build out – a second level was added alongside an industrial elevator and a 10,000 exterior water storage room.